click to enlarge
The last thing we needed was for the ram’s seal to blow under 1,500psi and spray litres and litres of fluid into the engine room creating a highly flammable if not explosive oil mist.
Thankfully, this didn’t happen. By isolating the port fin, we were safe, although it meant the starboard fin would be left to do all the work on its own.
Golden Arrow & International Rescue
Having spoken with Brian George, Golden Arrow’s TRAC stabiliser commissioning specialist, a master plan was hatched.
Brian, based in Southampton, would take the ferry to Cherbourg and drive to La Rochelle with a van load of tools, spares and oil, to repair Play d’eau on 30 June.
30 June 2015

click to enlarge
Without delay, he disappeared into the engine room, squeezed between the port engine and the bulkhead and began disassembling the top plate and ram.
‘Aha. That’s the problem. The yoke’s misaligned with the ram causing the piston to operate slightly out of true, putting uneven pressure on the seal.’
Repairs
Having realigned the yoke, replaced the ram with new, centred the fin’s electronic sensor, replaced a weeping hose and topped up the oil reservoir, we were ready for a test.
‘Start the engine,’ Brian called. I did. ‘Perfect,’ said Brian. ‘No leaks, accurately aligned, and working a treat.’
With some small adjustments to the system’s operating parameters to bring Play d’eau more accurately level when cruising, the job was complete in seemingly no time at all.
What magnificent service. What a star!
Piers
from the Technical Log of
Play d’eau